The Cross River Rail Route

Cross River Rail is a 10.2km rail line from Dutton Park to Bowen Hills, which includes 5.9 kilometres of twin tunnels under the Brisbane River and Brisbane CBD.

The project includes construction of four new underground stations at Boggo Road, Woolloongabba, Albert Street and Roma Street.

It will also deliver upgrades to eight above ground stations including: Salisbury, Rocklea, Moorooka, Yeerongpilly, Yeronga, Fairfield, Dutton Park, and Exhibition.

A second river crossing

A second river crossing

The Cross River Rail project unlocks this bottleneck by delivering a second river crossing and will transform travel to, from and through Brisbane.

Brisbane’s new underground

Brisbane’s new underground

The route includes 5.9 kilometres of twin tunnels under the Brisbane River and CBD and four new underground stations at Boggo Road, Woolloongabba, Albert Street and Roma Street.

Proposed Salisbury Station upgrade concept

Southside Station Upgrades

Cross River Rail will rebuild six southside stations including: Salisbury, Rocklea, Moorooka, Yeerongpilly, Yeronga, and Fairfield.

Cross River Rail Route and Stations

Cross River Rail is a 10.2km rail line from Dutton Park to Bowen Hills, which includes 5.9 kilometres of twin tunnels under the Brisbane River and Brisbane CBD.

Cross River Rail’s route includes 10.2 kilometres of new rail line, 4 new underground stations, 5.9 kilometres of twin tunnels under the Brisbane River and CBD, and will rebuild 8 above-ground stations covering Salisbury to Dutton Park, and Exhibition.

Check out our interactive map and click on any station to find out more.

Fly-Along Video

Get a different perspective on the project with this fly-along video of the stations and route.
  Cross River Rail’s route includes 10.2 kilometres of new rail line, 4 new underground stations, 5.9 kilometres of twin tunnels under the Brisbane River and CBD, and upgrades to 8 above-ground stations covering Salisbury to Dutton Park, and Exhibition.
  The video includes concept developments which are not final or approved.

Fly-Along Video

Get a different perspective on the project with this fly-along video of the stations and route.
  Cross River Rail’s route includes 10.2 kilometres of new rail line, 4 new underground stations, 5.9 kilometres of twin tunnels under the Brisbane River and CBD, and upgrades to 8 above-ground stations covering Salisbury to Dutton Park, and Exhibition.
  The video includes concept developments which are not final or approved.

Brisbane’s New Underground

The Cross River Rail route includes a 5.9 Kilometre underground section of twin tunnels under the Brisbane River and CBD. 4 new underground stations will be delivered at Boggo Road, Woolloongabba, Albert Street and Roma Street. Watch our animation for more information on Brisbane’s first underground!

Brisbane’s New Underground

The Cross River Rail route includes a 5.9 Kilometre underground section of twin tunnels under the Brisbane River and CBD. 4 new underground stations will be delivered at Boggo Road, Woolloongabba, Albert Street and Roma Street. Watch our animation for more information on Brisbane’s first underground!