Woolloongabba Site Construction

The area between Vulture Street and Stanley Street in Woolloongabba, directly adjacent to the Woolloongabba Busway, was the staging area for the Tunnel Boring Machines (TBMs) and Roadheaders. The TBMs tunneled north from Woolloongabba, breaking through into the station caverns at Albert Street and Roma Street, finally emerging at the northern portal.

Station precinct earthworks and canopy.

Woolloongabba station construction update - August & September 2025

The building façade at Woolloongabba station is transforming with the recent installation of glazed glass panes on the southern and northern entrances.

Full road closure on Gibbon Street from mid-August 2025.

Gibbon Street traffic changes

From mid-August 2025 for approximately six weeks, a full road closure will be in place at the intersection of Gibbon Street and the Stanley Street service road to install underground services and reinstate the road surface.

mage showing a map that shows the Night-time vehicle and pedestrian changes from Monday 21 July 2025.

Leopard Street temporary traffic changes

From Monday 21 July 2025 for up to four weeks, lane and footpath closures will be in place along a section of Leopard Street near the Woolloongabba station site. These closures will occur nightly between 6:30pm and 6:30am.

Jump work at Woolloongabba.

Works notices

Access information on works notifications relating to construction at our Woolloongabba site.